Aguçadoura
Aguçadoura, north of Póvoa de Varzim, saw the birth in 2008 of a wave park presented as the world's first commercial one. About five kilometers off the coast, three Pelamis machines were installed, generating electricity from the movement of the waves. Each one had a capacity of 750 kilowatts, for a total of 2.25 megawatts. The first machine was placed on July 15, 2008, and the whole installation was presented on September 23. The technology belonged to the British company Ocean Power Delivery, and the investment was made by the Portuguese group Enersys, with part of the funding coming from public aid in the form of a non-repayable grant. The project operated for a very short time and was then left at a standstill. The second phase, of 24 megawatts and twenty-eight machines, was never built. In 2011, an experimental floating wind platform was installed off this coast, and it was dismantled in 2016.