KmdeAudio · Segovia, Spain · Audio story for the road
Túnel de Guadarrama · La autopista del Noroeste

The Guadarrama Tunnel runs through the sierra beneath the Alto del León pass, and for generations of drivers it has been the way north. Its first bore opened on December 4, 1963, when the N-VI road still had a single carriageway. It was part of the Noroeste motorway, the AP-6, between Villalba and Adanero. In 1972, when the motorway was extended toward Adanero, the second bore was drilled, and in 2007 the third arrived. The first tube, from 1963, now operates in reversible mode, depending on traffic needs. When it opened, the full motorway was about seventy kilometers long. The remaining stretches, from Madrid to Guadarrama and from Adanero to Arteijo, are dual carriageway, the A-6. Crossing the tunnel was, and still is, the moment when the landscape changes: you leave Madrid behind and enter Castile.